Broadway Road Improvements CP0439P2


 

 

Project Updates

 

09/15/2014

The City of Mesa has selected Skanska USA Civil West for the Broadway Road Improvements - Power Road to Sossaman Road project.

Contractor has scheduled to have 72nd Street closed south of Broadway Road starting Saturday September 20th at 6:00 am until Monday September 22nd at 5:00. This closure is necessary so Skanska can install storm drain across 72nd Street.

 

Project Schedule

Construction will begin August 25, 2014 and last approximately eight months.

Project Details

Broadway Road will have two through lanes with a bike lane in each direction and a striped median. Improvements include; curb and gutter, sidewalks, street lights and traffic signals, a storm drain system, landscaping with irrigation, water lines, and masonry screen walls in selected areas.

This project will also include the final phase of the proposed drainage improvements at the 72nd Street drainage channel. These improvements include reconstructing the culvert crossing, installing a new storm drainage system, and lowering Broadway Road and the channel.


Project Funding

The project is funded by the 2013 Street Bond Authorization and 2010 Water Bond Authorization.

 

 

Project Location Map

Road Closures and Lane Restrictions

Engineering Home

Find us: mctraffic  Facebook Icon  Twitter Icon

Open during Construction

 

The businesses listed below are participating in our Shop Mesa program and are offering some great construction specials! Be sure to check them out!