Fire Station 220
Project Number 01-757-001


 

Project Updates

 

10/31/2012

FCI Constructors, Inc., is the Construction Manager at Risk contractor (CMAR) for this project which is located at 5763 E. Main Street.

Fire Station 220 Grand Opening was held October 23, 2012 at 10:00 am.

 

Project Schedule

 

Project completed.

 

Project Details

 

Fire Station 220 is a voter-approved bond project planned to help meet the demand for emergency call volume in growth and enhance emergency response times.  This will be the fourth fire station built since 2009 and will help serve central east Mesa. It will be the second City of Mesa building to be LEED certified. The goal is to achieve LEED “Gold” certification.  This is part of the requirement to receive the FEMA grant.

Examples of “green building” features will include a photovoltaic solar electric system (solar panels), a solar hot water system, and an ICF (Insulated Concrete Form) wall system at the exterior walls to provide R40 +/- insulation value.

The project consists of approximately The approximately 13,900 square foot single story building will be constructed on a 2.3-acre parcel located at the southwest corner of Main and 58th Streets. The station will include four apparatus bays that exit onto 58th Street, living quarters for the fire- 2 fighters, including six dorm rooms for firefighters and two dorm rooms for captains, and a community/training room available for public use. The project will construct half street improvements on 58th Street and adds a median opening with a traffic signal on Main Street.

 

Project Funding

 

The recommended total award amount for this project is $4,323,862.40, based on the low bid of $3,930,784.00 plus an additional $393,078.40 (10% allowance for change orders). Funding is available in the FY10/11 Fire Bond Capital Program ($2,303,862.40) and from the ARRA-SCG grant ($2,020,000).