04/14/2014

 

The City of Mesa has awarded a Job Order Contract to B&F Contracting. Construction began on 8th Street and Harris Drive and will move north on Harris Drive towards Brown Road.

The new water line has been installed between Frost and Fountain and continuing north. Crews working on installing laterals on the west side to the connection point.

Project Schedule

Construction started March 17, 2014 and will last approximately three months.

Project Details

Project will include replacement of a waterline on Harris Drive between 8th Street and Brown Road. The work will include the connection of a new 12-inch waterline to accommodate future use without the worry of breaks in the existing line.


Project Funding

This project is funded by the voter approved 2010 Water Bond Fund.

 

 

Project Location Map

Fact Sheet

Construction Progress Photos

Road Closures and Lane Restrictions

Engineering Home

Find us: mctraffic  Facebook Icon  Twitter Icon

Open during Construction

 

The businesses listed below are participating in our Shop Mesa program and are offering some great construction specials! Be sure to check them out!