A Mesa inspector conducts the requested examination based on the approved plans and adopted Mesa Codes and Ordinances.
Approved inspections allow work to continue to the next phase.
Failed inspections require corrections and the inspection to be rescheduled. The list of inspection corrections will be viewable through the DIMES record. After completing the corrections, the customer must schedule for a re-inspection. Upon passing the re-inspection, work may continue to the next stage.
Depending on result, the permit applicant will receive an email from the DIMES system. Be sure to check spam files for the email as it comes from noreply@mesaaz.gov.
All required inspections must be conducted, and the construction approved before occupancy will be allowed.
The final inspection is conducted when work on the project is completed. This includes all off-site (right-of-way) and on-site (lot) improvements, if applicable.
When the project is completed, the permit will be closed.
To find Certificate of Occupancy or a Certificate of Completion online
- Login to DIMES
- Type PMT# in search bar
- Click the dropdown arrow next to Record Info
- Select Attachments
- Click the hyperlink to view, download and print documents