City of Mesa
Home MenuArchitectural/Engineering Design Opportunities
NOTICE FOR RFQ’S: The City of Mesa Engineering Department will only be accepting electronic submissions for selections.
Please read the entire Request for Qualifications (RFQ) and all attachments before submitting a Response. Responses must be in accordance with the provisions, specifications and instructions set forth in the RFQ. Responses will be accepted until the date and time the Response is due. All Responses received after the Response due date and time shall not be considered for award.
Please submit your Response to the following email: Engineering-RFQ@mesaaz.gov
Maximum file size is 20M. Please ensure that your email is smaller than this before sending.
Email SUBJECT line must include the Project Number/Name and Due Date/Time.
Responses received after the due date and time shall not be considered for award. Upon submission of an SOQ, a confirmation email will be sent. If no email is received, please contact the City (contact listed in the RFQ) to verify receipt.
The table below represents upcoming design RFQ's anticipated to be released by the City for design services only. To differentiate projects on our website, the projects listed on this page under "Architectural/Engineering Design Opportunities" are strictly for professional design services.
The City's Engineering Department will investigate all questions submitted regarding opportunities listed below. If the answer is not already in the bidding documents/RFQs an addendum will be issued. If the question is NOT answered via an addendum the answer can be found in the bidding documents/RFQs.
The City of Mesa's Protest Policy is in Procurement Rules, Article 6. Protest, Appeals, Debarments, Confidential Information, and Contract Disputes.
All construction bid opportunities are posted. Consultants can register at the City of Mesa Vendor Self-Service (VSS) System.
Documents below in PDF format.
Project | SOQ DUE Date |
Lift Station Rehabilitation Design Concept Reports:
|
December 19, 2024, by 2pm |
i.d.e.a. Museum Renovations Phase 2 |
October 3, 2024 by 2pm |
September 19, 2024 by 2pm | |
Northwest Water Reclamation Plant Solids Stream Improvements
|
August 8, 2024 by 2pm |
May 2, 2024 by 2pm The City is entering negotiations with:
|
|
Falcon Field Airport: On Call Consulting Services for Airport Projects
|
March 28, 2024 by 2pm The City is entering negotiations with:
|
Greenfield Water Reclamation Plant Phase IV Expansion |
March 7, 2024 by 2pm The City is entering negotiations with Hazen & Sawyer |
Pecos Road Basins and Storm Drain |
February 29, 2024 by 2pm |
Power Road Improvements: EMF to 202 |
November 16, 2023 by 2pm The City is entering negotiations with EPS Group, Inc. |
2023-2026 On-Call Consulting Services for Soils and Construction Materials Sampling and Testing
|
November 9, 2023 by 2pm The City is entering negotiations with:
|
On-Call Consultant List for Architectural Services
|
October 26, 2023 by 2pm The City is entering negotiations with:
|
On-Call Consultant List for Utility Subsurface Locating and Potholing Services
|
October 26, 2023 by 2pm The City is entering negotiations with:
|
Mountain Road from State Route 24 to Pecos Road Pre-Submittal Attendance Sheet
|
October 12, 2023 by 2pm The City is entering negotiations with Kimley-Horn and Associates |
Arizona Farms Road High Pressure Gas Line Replacement Pre-Submittal Attendance Sheet
|
September 7, 2023 by 2pm The City is entering negotiations with Kimley-Horn and Associates |
Off the Streets Facility Refurbishment Pre-Submittal Attendance Sheet
|
September 14, 2023 by 2pm The City is entering negotiations with C&S Companies |
On-Call Consulting Services for Construction Administration and Inspection Services Addendum No. 1 issued August 23, 2023
|
August 31, 2023 by 2pm The City is entering negotiations with:
|
Downtown District Revitalization - Facade Improvements Pre-Submittal Attendance Sheet
|
September 7, 2023 by 2pm The City is entering negotiations with:
|
2023-2028 On-Call Consultant List for Water and Wastewater Plant Services
|
August 24, 2023 by 2pm The City is entering negotiations with:
|
US60 Shared Use Path - Consolidated Canal to Eastern Canal |
July 27, 2023 by 2pm The City is entering negotiations with Y2K Engineering |
On-Call Consulting Services for Water and Wastewater Pipeline Design
|
July 27, 2023 by 2pm The City is entering negotiations with:
|
On-Call Consulting Services for Cost Estimating
|
August 3, 2023 by 2pm The City is entering negotiations with:
|
Water, Gas and Sewer Improvements - QS 12B and 12D Pre-Submittal Attendance Sheet
|
July 13, 2023 by 2pm The City is entering negotiations with Entellus |
On-Call Consulting Services for General Engineering Services |
June 22, 2023 by 2pm The City is entering negotiations with:
|
East and West Mesa Service Center Fleet Master Plan Pre-Submittal Attendance Sheet
|
May 25, 2023 by 2pm The City is entering negotiations with Arrington Watkins Architects, LLC |
Pecos Relief Sewer Pre-Submittal Planholders List
|
May 18, 2023 by 2pm The City is entering negotiations with Sustainability Engineering Group (SEG) |
For opportunities prior to those listed above, please email EngineeringBids@MesaAz.gov. Please include the project number and full name of the project that you are requesting.