Shared Use Path Projects

Print
Press Enter to show all options, press Tab go to next option

Paths - $12.4 M

Lehi Crossing Shared Use Path

Construct a 2.2 mile path from McDowell Road to Loop 202 near Lehi Crossing.

Contact: Curt Albright, City of Mesa 480-644-3800 or Engineering.Info@MesaAZ.gov

Project Timeline:

  • Design -Complete
  • Construction -TBD

    Lehi Crossing path


Eastern Canal Shared Use Path

Improve 2.3 miles along the Eastern Canal with a focus on signalized pedestrian crossings from Brown Road to Broadway Road.

Project Timeline:

  • Design - Summer 2022
  • Construction - Fall 2023

Eastern Canal path